This project involves rebuilding a failed water feature into a durable, aesthetically enhanced 9-to-10-foot pitless waterfall and stream system.
Key Project Details
-
The Problem: A previous contractor installed a waterfall stream utilizing a traditional crate/rock pit system. The homeowner was unsatisfied with the results and tore out the original installation.
-
The Solution: Upgrading the feature to a Pitless Waterfall & Stream Kit system to ensure superior longevity, easier maintenance, and better functionality.
-
Scope of Work:
-
Complete demolition, clearing, and moving of existing small rocks.
-
Re-digging and reshaping the terrain contour to optimize water flow and structural layout.
-
Integrating newly brought-in larger boulders to replace the original, undersized rock layout and establish a natural appearance.
-
Full installation of the new pitless system and final rock placement.
-

